Our Crane Service

.

.

Words from our Director - BRAD DORE.

"No elevator, Tight stair cases, Balconies not rated for the weight, Windows out of reach, access is limited."

 

Saves the Money, your back and your labour TODAY.

Gets your staff to work faster materials are installed with less damage from traditional pass up methods, less workers compensation to worry about. No Men down with stained muscle or worse backs.
JOB is now easier and quicker to install as everyone is fit and healthy. Makes your staff appreciate the employer because the worst thing to start the day is the dreaded PASS UP with tonnage. After all if your staff are fresh, they concentrate on the important thing, THE JOB so there are fewer mistakes quicker finish times and happier clients.

 

Crane Visual

Visual crane2

Visual Crane 3

 

HOW TO START OFF A MULTI STOREY PROJECT

The Easiest way to pass up, plasterboard, Water, Fire, Impact, Shaft liner, Cement fibre sheeting, Sundries, Metal Studs, Suspension Grid and Tile, Plasters, Insulation, Scaffolding,
Visual Interiors will lift it all if it helps you.
The largest sizes can be lifted including 10mm, 13mm, 16mm 25mm, with the longest sheet being 6000 mm long x 1350 mm wide to upper Floors. The crane can lift flat packed or vertical so we can usually gain a access point to suit.

Visual Interiors best ever record to date is
30 packs of plasterboard or
1500 sheets of 2700 x 1200 x 13 mm
All in only 6 hours
If we included all the sundries which was another 2 hrs of lifting there was just smidgen over 42 tonnes delivered over three floors with 6 men



CONTACT VISUAL TODAY TO EXPERIENCE THE POWER OF CRANE !!